Concrete work and area ready for the Miraflex





The press is 3 days away from coming through the doors at Bema. Then the process of installing, testing and debugging the press begins. This process should take approximately 45 days. That being the case, the press should be up and running by mid-February.
The last time Bema installed the  W& H , 10 color Primaflex, the process went smoothly and was running product 2 days after commissioning. Based on prior experience with W&H equipment , we are anticipating the same with the W&H 8 color Miraflex press.
 More to come as the press arrives!